In the heart of Alberta’s natural beauty, the HWY 670 Bezanson Creek Bridge Replacement project (BF71933) presented a unique opportunity for ERK Construction Inc. to showcase its expertise in delivering complex infrastructure solutions while minimizing environmental impact. This project involved the replacement of the existing bridge structure, reconstruction of the creek channel, and substantial roadwork, all while ensuring the protection of the surrounding ecosystem.
Our Commitment:
At ERK Construction Inc., we are Committed to Sustainability and Environmental Responsibility. We strive to minimize our environmental footprint and promote sustainable practices in all our projects, while delivering high-quality infrastructure solutions that meet the needs of our clients and communities.
Project Details:
- Project: BF71933 – HWY 670, Bezanson Creek Bridge Replacement, near Grand Prairie, Alberta
- Client: Alberta Transportation and Economic Corridors

Description: Traffic Accommodation, demolition and removal of existing bridge structure, reconstruction of creek channel c/w rock armoring, supply and installation of steel h-piles, construction of cast-in-place concrete substructures, supply and installation of precast concrete girders, cast-in-place concrete deck and approach slabs, and substantial roadwork with re-profiling and raising existing highway, and subsequent base gravels, asphalt paving, new guardrails and ancillary items such as signage and traffic markings.
Our Role:
ERK Construction Inc. was the general contractor on this project. We managed all scopes, work fronts, and subcontractors while self-performing the demolition, and all the concrete work internally.
Key Statistics:
- Zero lost time injuries or incidents
- Project completed on schedule and on budget
- No environmental or traffic accommodation infractions
Challenges Overcome:
- Bezanson Creek is part of an environmentally sensitive ecosystem, requiring careful execution of the work to minimize impact
- The project was in close proximity to local residents, who were farmers with strong expectations for responsible construction practices
- The project required substantial roadwork, including re-profiling and raising the existing highway, and subsequent base gravels, asphalt paving, new guardrails, and ancillary items
Result:
The client was extremely satisfied with ERK Construction Inc.’s performance, and the consultant provided a letter of recommendation for the high-quality end product delivered. By prioritizing sustainability and environmental responsibility, we aim to create infrastructure solutions that not only meet the needs of our clients but also contribute to a healthier and more sustainable environment for future generations.create infrastructure solutions that not only meet the needs of our clients but also contribute to a healthier and more sustainable environment for future generations.