The Springbank Off-Stream Reservoir – SR1 project, located in Calgary, Alberta, Canada, is a landmark infrastructure undertaking that showcases ERK Construction Inc.’s expertise in delivering complex and critical projects. As a key component of the city’s flood-mitigation strategy, this project involved the construction of a state-of-the-art dam designed by Stantec Engineering. ERK Construction Inc. is proud to have played a vital role in the project’s success, completing nearly all the concrete scopes and demonstrating its ability to meet the most challenging requirements.
Our Commitment:
At ERK Construction Inc., we are Committed to Sustainability and Environmental Responsibility. We strive to minimize our environmental footprint and promote sustainable practices in all our projects, while delivering high-quality infrastructure solutions that meet the needs of our clients and communities.
Project Details:
- Project: Springbank Off-Stream Reservoir – SR1, Calgary, Alberta, Canada
- General Contractor: Vinci Geoinfrastructure

- Year: 2022-24
- Description: The Springbank Off-Stream Reservoir – SR1 project involved the construction of a flood-mitigation dam designed to protect Calgary from future flooding events. The project required the expertise of multiple stakeholders, including ERK Construction Inc., to ensure its successful completion.
Our Role:
ERK Construction Inc. was subcontracted by Vinci Geoinfrastructure to provide specialized support for the project. Our scope of work included:
- Completing nearly all the concrete scopes on the project, including:
- Low-Level Outlet Works
- Diversion Inlet
- Service Spillway
- Debris Deflection Barrier
- Auxiliary Spillway
- Placing approximately 50,000 cubic meters of concrete over a two-year period
- Demonstrating expertise in complex concrete pours, including 12-meter tall walls and slab pours over 700 cubic meters at a time
- Employing over 100 skilled carpenters, concrete finishers, operators, laborers, field engineers, and other project management staff during peak times
Key Statistics:
- Project duration: 2022-24
- ERK Construction Inc.’s scope of work: nearly all concrete scopes on the project
- Concrete placement: approximately 50,000 cubic meters over a two-year period
- Peak workforce: over 100 skilled tradespeople and project management staff
Challenges Overcome:
- Complex project requirements, including multiple stakeholders and a tight construction schedule
- Challenging weather conditions, including extreme temperatures and precipitation
- Ensuring the highest level of quality and workmanship in all aspects of the project
- Coordinating with other subcontractors and stakeholders to ensure a smooth construction process
Result:
The successful completion of the Springbank Off-Stream Reservoir – SR1 project marks a significant achievement for ERK Construction Inc. and Vinci Geoinfrastructure. By prioritizing sustainability and environmental responsibility, we aim to create infrastructure solutions that not only meet the needs of our clients but also contribute to a healthier and more sustainable environment for future generations. We are proud to have been a part of this critical project, which will play a vital role in protecting Calgary from future flooding events.