The Bow River Bridge project, situated in NW Calgary, Alberta, Canada, was a pivotal undertaking that showcased ERK Construction Inc.’s expertise in delivering complex infrastructure solutions. As a key component of the West Calgary Ring Road, this project aimed to establish a vital connection between the ring road and the surrounding transportation network. ERK Construction Inc. was proud to be a part of this endeavor, providing high-end labor support to the Flatiron-Aecon Joint Venture.

Our Commitment:
At ERK Construction Inc., we are Committed to Sustainability and Environmental Responsibility. We strive to minimize our environmental footprint and promote sustainable practices in all our projects, while delivering high-quality infrastructure solutions that meet the needs of our clients and communities.

Project Details:

  • Project: Bow River Bridge, Calgary, Alberta, Canada
  • General Contractor: Flatiron-Aecon Joint Venture
  • Year: 2020-22
  • Description: The Bow River Bridge project involved the construction of a critical bridge structure, designed to connect the West Calgary Ring Road with the remainder of the ring road. This project required the expertise of multiple stakeholders, including ERK Construction Inc., to ensure its successful completion.

Our Role:
ERK Construction Inc. was subcontracted by the Flatiron-Aecon Joint Venture to provide labor support for the project. Our scope of work included:

  • Supplying high-end carpenters, concrete finishers, and general laborers to support the general contractor’s crews
  • Assisting in general formwork assembly, deck pours, curb/barrier construction, and various finishing elements
  • Providing expertise in complex infrastructure construction, including bridge building and transportation network connectivity

Key Statistics:

  • Estimated project value: $89 Million
  • Project duration: 2020-22
  • ERK Construction Inc.’s scope of work: labor support, formwork assembly, deck pours, curb/barrier construction, and finishing elements
  • Peak workforce: 25-30 tradespeople on site

Challenges Overcome:

  • Complex project requirements, including multiple stakeholders and a tight construction schedule
  • Challenging weather conditions, including extreme temperatures and precipitation
  • Ensuring the highest level of quality and workmanship in all aspects of the project
  • Coordinating with other subcontractors and stakeholders to ensure a smooth construction process

Result:
The successful completion of the Bow River Bridge project marked a significant achievement for ERK Construction Inc. and the Flatiron-Aecon Joint Venture. By prioritizing sustainability and environmental responsibility, we aim to create infrastructure solutions that not only meet the needs of our clients but also contribute to a healthier and more sustainable environment for future generations.